There were 117 press releases posted in the last 24 hours and 398,674 in the last 365 days.

Bridge replacement on Iowa 3 over the Cedar River in Waverly begins on Aug. 1

Posted on: July 10, 2024


NEW HAMPTON, Iowa – July 10, 2024 – Upcoming construction work to replace the Iowa 3 bridge over the Cedar River in Waverly will occur from Thursday, Aug. 1, until the fall of 2025, weather and river level permitting. Work will take place during the winter months when possible.

While the bridge is closed, you will follow a marked detour route using 10th Avenue Southwest and Cedar River Parkway. Pedestrian access to businesses east of the river in Waverly will be maintained.

For more information about this and other Iowa DOT construction projects in Black Hawk and Bremer counties, follow the Black Hawk and Bremer County Construction Facebook page at www.facebook.com/BlackHawkBremerCo#!BlackHawkBremerCo.

The Iowa DOT reminds motorists to drive with caution, obey the posted speed limit and other signs in the work area, and be aware that traffic fines for moving violations are at least double in work zones. As in all work zones, drivers should stay alert, allow ample space between vehicles, and wear seat belts.

The latest traveler information is available anytime through our 511 system. Visit 511ia.org; call 511 (within Iowa) or 800-288-1047 (nationwide); stay connected with 511 on Facebook or X (find links at https://iowadot.gov/511/511-social-media-sites); or download the free app to your mobile device.

It’s easy to subscribe to Your 511 and sign up to receive email/text alerts. Visit https://new.511ia.org/#login to sign up. For instructions and help with this feature, visit https://www.511ia.org/help/section/how-to-create-and-manage-a-511-account.html.

#

For general information about this project contact Ron Loecher, New Hampton construction office, at 641-394-3161 or [email protected]